Australian High Commission, Wellington

  • Division: Interiors
  • Location: Wellington
  • Started: November 2005
  • Cost: $8.3 million
  • Client: Australian DFA&T
  • Completed: March 2007

Refurbishment of the existing four-storey Australian High Commission in Wellington.

The refurbishment involved extending the ground floor function area, construction of a new office for the consul, relocation of 26 staff offices to the second floor, and conversion of the theatre into new function and meeting rooms.

Security systems also received an overhaul, including construction of three security vaults with 500kg vault doors and sealed intruder resistant walls, installation of bullet proof and intruder resistant walls and doors, as well as security bollards to the exterior of the building and an iris recognition system to lock/unlock the building.

Other Parties

  • Name: Sinclair Knight Merz
  • Role: Project Manager
  • Name: GHD
  • Role: Consultant

More <>

Current and Recent Projects

Building
Laminex Distribution Centre >> The new Laminex Distribution Centre is rapidly taking shape. 
Engineering
Victoria Park Alliance >> A Fletcher , Higgins, Beca, Parsons & Brinckerhoff and NZ Transport Agency alliance to design and construct a 2.2km upgrade of SH1 between Wellington Street and the Auckland harbour bridge.
Interiors
AUT WE Stage 2 – School of Art & Design >> The second stage of AUT’s School of Art & Design refurbishment to Levels 5-7 (the two-level first stage refurbishment was completed a year ago).
South Pacific
Leadership Code Commission and Ombudsman’s Office >> Refurbishment of existing and additional offices and amenities.