Middlemore Hospital
- Division: Building
- Location: Auckland
- Started: November 2007
- Cost: $27.1 million
- Client: Counties Manukau DHB
- Completed: May 2009
Edmund Hillary Block Stage 1
Construction of the base building, fitout of the cardiac investigation unit on level one and complete fitout of levels three and four comprising some 119 beds of the 240-bed six-level L-shaped facility.
Designed with patients in mind, the bedrooms maximise natural light and there are a greater number of single rooms along with internal bathrooms in each room than in the 'existing' hospital.
Articles
Standing Firm
Considerable care was taken to preserve an oak tree on the Middlemore Hospital site
Mid-career – more hospitals
Demonstrating an affinity for health sector work, Chris Tuxford has been the man-on-the-job for numerous hospital projects around the country during his time.
Other Parties
- Name: Klein
- Role: Architect


