Avalon Drive Bypass
- Division: Engineering
- Location: Hamilton
- Started: February 2007
- Cost: $26.6 million
- Client: Transit NZ
- Completed: October 2008
Construction of two major roundabouts, two bridges, and a 2.7km two-lane bypass off Avalon Drive.
The project provided a free-flowing, high-capacity route bypassing a congested section of Avalon Drive from Rotokauri Road to Forest Lake Road.
One of the main challenges was the construction of the Norton Road rail over-bridge with its numerous service diversions, signalling shifts and work running alongside the Main Trunk rail line – one of the busiest rail track lines in the Waikato.
Articles
Safely Does It
The Brian Perry Civil team at the Avalon Drive Bypass project in Hamilton started the year on a positive note, racking up 12 months with zero LTIs (Lost Time Injuries).
Other Parties
- Name: Higgins
- Role: Civil Contractor
- Name: Schick Construction
- Role: Earthworks