Mangatawhiri Dam Spillway
- Division: Engineering
- Location: Auckland
- Started: May 2007
- Cost: $2.5 million
- Client: Watercare Services
- Completed: November 2007
Built in the early 1960s, the spillway channel was at the point of yield due to a slip plane in the adjacent hillside and required reinforcing.
Brian Perry Civil relined the channel and excavated and refilled a 100m long by 8m deep hole at the base of the spillway, remnant of a major spill in 1966 that ran at 140m3 per second at its peak.