PRINT

Era Dorina Apartments – Stage 4

  • Division: South Pacific
  • Location: Papua New Guinea
  • Started: March 2007
  • Cost: PGK $26 million
  • Client: Credit Corporation (PNG)
  • Completed: March 2009

Situated beside the three blocks of two-levelled apartments already completed, this project involves construction of an eight-level apartment building.

Once complete the apartment building will offer a range of facilities including a fitness club featuring a 12m x 3m lap pool and state-of-the-art gymnasium.

Articles

Their homes are a castle
Two years on and stage 4 of the Era Dorina project is complete.

Safe as houses
It’s been 18 months since work started on stage 4 of the Era Dorina project.

A new safety conscious era
The team at Era Dorina Apartments, Port Moresby is ploughing ahead with stage four having completed the earth works, footings and the basement up to level two.

Other Parties

  • Name: Cullenfeng
  • Role: Architect
  • Name: Kramer Group
  • Role: Engineer

More <>

Current and Recent Projects

Building
Laminex Distribution Centre >> The new Laminex Distribution Centre is rapidly taking shape. 
Engineering
Victoria Park Alliance >> A Fletcher , Higgins, Beca, Parsons & Brinckerhoff and NZ Transport Agency alliance to design and construct a 2.2km upgrade of SH1 between Wellington Street and the Auckland harbour bridge.
Interiors
AUT WE Stage 2 – School of Art & Design >> The second stage of AUT’s School of Art & Design refurbishment to Levels 5-7 (the two-level first stage refurbishment was completed a year ago).
South Pacific
Leadership Code Commission and Ombudsman’s Office >> Refurbishment of existing and additional offices and amenities.