Fiji Water Bottling Factory Expansion

  • Division: South Pacific
  • Location: Fiji
  • Started: March 2006
  • Cost: FJD $4.5 million
  • Client: Natural Waters of Viti
  • Completed: April 2007

Design-build contract to expand of the Fletcher-built Fiji Water bottling factory.

With demand for Fiji Water continuing to grow the factory required a 5,000m2 extension to allow for a third high tech bottling plant. The new addition also houses a recycling area for returned plastic bottles.

Other Parties

  • Name: Cuthbert Ashmore Consultants
  • Role: Consultant

More <>

Project Facts

  • Fletcher built the original factory in 1999
  • On completion of the original factory, Fiji Water production went from bottling just 4 bottles of water every 20 seconds to 48 bottles
  • The expansion allows the factory to nearly double production

Current and Recent Projects

Building
Laminex Distribution Centre >> The new Laminex Distribution Centre is rapidly taking shape. 
Engineering
Victoria Park Alliance >> A Fletcher , Higgins, Beca, Parsons & Brinckerhoff and NZ Transport Agency alliance to design and construct a 2.2km upgrade of SH1 between Wellington Street and the Auckland harbour bridge.
Interiors
AUT WE Stage 2 – School of Art & Design >> The second stage of AUT’s School of Art & Design refurbishment to Levels 5-7 (the two-level first stage refurbishment was completed a year ago).
South Pacific
Leadership Code Commission and Ombudsman’s Office >> Refurbishment of existing and additional offices and amenities.