PRINT

Deutsche Bank – Vero Centre

  • Division: Interiors
  • Location: Auckland
  • Started: January 2007
  • Cost: $3.5 million
  • Client: Deutsche Bank
  • Completed: June 2007

Refurbishment of level 36 in the Vero Centre for Deutsche Bank.

The design featured recycled kauri panelling on walls through and around core and two 6m operable walls, one finished in perforated leather. The three main meeting rooms at the front of the floor were fitted with fully automated audio/video conference facilities. A commercial kitchen and large internal server room were also installed.

Other Parties

  • Name: Coffey Projects
  • Role: Project Manager

More <>

Current and Recent Projects

Building
Laminex Distribution Centre >> The new Laminex Distribution Centre is rapidly taking shape. 
Engineering
Victoria Park Alliance >> A Fletcher , Higgins, Beca, Parsons & Brinckerhoff and NZ Transport Agency alliance to design and construct a 2.2km upgrade of SH1 between Wellington Street and the Auckland harbour bridge.
Interiors
AUT WE Stage 2 – School of Art & Design >> The second stage of AUT’s School of Art & Design refurbishment to Levels 5-7 (the two-level first stage refurbishment was completed a year ago).
South Pacific
Leadership Code Commission and Ombudsman’s Office >> Refurbishment of existing and additional offices and amenities.