Arts Centre of Christchurch
- Division: Building
- Location: Christchurch
- Started: March 2008
- Cost: $1.2 million
- Client: Arts Centre of Christchurch
- Completed: October 2008
Bearing up in old age
Following seismic strengthening works to the Old Registry Building at the Arts Centre in 2004, Fletcher has been involved with a number of projects for the Arts Centre of Christchurch, the most recent involving seismic strengthening and refurbishment of the School of Art building.
An advanced Fibre Reinforced Polymer (FRP) wrap was chosen as a more suitable material for seismic strengthening of the building because it is less invasive and allows the building to move safely during the event of an earthquake.
Other Parties
- Name: Sheppard & Rout
- Role: Architect
- Name: Holmes Consulting Group
- Role: Engineer/Project Manager


