Hamilton Boys High School Fitness Centre

  • Division: Building
  • Location: Waikato
  • Started: October 2008
  • Cost: $6 million
  • Client: Hamilton Boys High School
  • Completed: January 2010

Construction on a new fitness and training centre for Hamilton Boys High School.

The new facility is being built adjacent to and integrated with the existing gym. In the hope of attracting more international basketball fixtures, it will house basketball courts with associated lighting that meets international standards. The main gym will also feature a sprung sports floor and mechanically operated bleachers which can be folded away.


The changing room area will be constructed almost entirely of pre-cast concrete panels with all services, including piping for showers, being cast into the concrete panels at the time of manufacture. The external building will also be constructed mostly of pre-cast concrete with a highly figured architectural finish cast into the façade.

Articles

Fit for boys
Yet another educational project for the Hamilton branch – construction on a new fitness centre for Hamilton Boys High School got underway late last year.

Hamilton Boys High School
Hamilton Boys High School

Other Parties

  • Name: Stiles & Hooker
  • Role: Architect/Project Manager

More <>

Current and Recent Projects

Building
Laminex Distribution Centre >> The new Laminex Distribution Centre is rapidly taking shape. 
Engineering
Victoria Park Alliance >> A Fletcher , Higgins, Beca, Parsons & Brinckerhoff and NZ Transport Agency alliance to design and construct a 2.2km upgrade of SH1 between Wellington Street and the Auckland harbour bridge.
Interiors
AUT WE Stage 2 – School of Art & Design >> The second stage of AUT’s School of Art & Design refurbishment to Levels 5-7 (the two-level first stage refurbishment was completed a year ago).
South Pacific
Leadership Code Commission and Ombudsman’s Office >> Refurbishment of existing and additional offices and amenities.